Blog

Construction Company Website: What You Need & Cost

Summary

A construction company needs a website that brings in enquiries, not a digital business card: a page for every service or product, "from" prices, a price calculator when the cost depends on area or volume, real project photos, city pages and enquiries that land straight in WhatsApp or your CRM. A landing page costs from $500 and takes 5–7 days; a multi-page site with an admin panel costs from $1000 and takes 2–3 weeks.

If you run a construction company or make building materials, your website is a sales tool, not an “about us” business card. Below is what it should include, what it costs and what my clients in Kazakhstan got from theirs: roofing and window companies, asphalt contractors, and makers of facade and sandwich panels.

What kind of website does a construction company need?

One that lets a visitor understand three things within a minute: what you do, roughly what it costs, and how to reach you. A small company with one or two services is fine with a landing page — from $500, 5–7 days. If you have many services or products, work in several cities and want to change prices yourself, you need a multi-page site with an admin panel: from $1000, 2–3 weeks. If you sell products with a cart and online payment, an online store starts from $2000.

What should a construction company website include?

  • A separate page for every service or product type. Roof repair, metal roofing, uPVC windows, asphalt paving. People search for a specific service, not for “a construction company”, and Google shows a specific page in the results.
  • “From” prices and timelines. Even a rough price filters out random calls and builds trust.
  • A price calculator when the cost depends on area or volume. I built calculators for the sandwich-panel plant qzpanel.kz, the facade-panel maker baq-stroy.kz and the rolled-metal supplier iron-group.kz.
  • Photos of real projects, not stock images. For a client, they are the main proof that the company has done this kind of work before.
  • City pages — only for the cities you actually serve. baq-stroy.kz has 22 of them. A copy of the same page with the city name swapped will not help: search engines demote pages like that.
  • Enquiries that go straight to where you handle them. On baq-stroy.kz an enquiry arrives in WhatsApp together with its source; on qzpanel.kz it goes to amoCRM automatically, with e-mail and Telegram notifications on top.
  • An admin panel, so you can change prices, photos and texts without a developer. iron-group.kz, barsogroup.kz and qzpanel.kz have one.
  • Fast loading on a phone. Contractors are often looked up on a smartphone, right on site, and a slow site gets closed before it opens.

What results does a website like this bring?

Figures from my clients’ Google Search Console:

  • kaz-jol.kz, asphalt paving in Almaty: in 28 days (26 August – 22 September 2026), 9,990 impressions in Google (+78%) and 160 clicks (+26%); the number of queries in the top 3 grew from 27 to 65.
  • rekrovli.kz, roofing in Almaty: after the move off Tilda, clicks from Google over 28 days grew from 17 to 60, and the site ranks 6.8 for the query “ремонт кровли алматы” (roof repair Almaty).
  • baq-stroy.kz, facade panels: over 3 months, 423 clicks, 6,170 impressions, a 6.9% CTR and an average position of 7.3.

This is not a guarantee of the same result: a lot depends on the niche, the city and the competition. But the structure of the site is the first thing that decides whether it is visible in search at all.

A Tilda site or your own?

Tilda is good for testing an idea quickly. Once the website becomes your main source of enquiries, its limits start to get in the way: speed, URL structure, CRM integrations. I moved rekrovli.kz, ismerdoors.kz and enstroy.kz off Tilda.

The key to a move is not losing what is already in search. Page addresses stay the same, and if one has to change, the old address gets a 301 redirect. On ismerdoors.kz all 28 addresses that were in search were kept.

How much does a construction company website cost?

FormatPriceTimelineWhen it fits
Landingfrom $5005–7 daysone or two services, a form and WhatsApp
Business (multi-page site)from $10002–3 weeksmany services and cities, admin panel, blog, SEO
E-commercefrom $20003–6 weeksa product catalogue with cart and payment

A calculator, amoCRM integration and city pages are added depending on the task. I give the exact price and timeline after a short brief, within 24 hours. More about the formats on the website development page.

Where to start?

  1. List your services or products and the cities you work in.
  2. Gather photos of your projects and rough “from” prices.
  3. Fill in the brief — I will send the site structure, timeline and exact price within 24 hours.

Frequently asked questions

How long does it take to build a website for a construction company?

A landing page takes 5–7 days, a multi-page site with an admin panel 2–3 weeks, and an online store 3–6 weeks. My fastest launch so far was iron-group.kz, a rolled-metal supplier: the site went live three days after work started.

Does a construction company website need a price calculator?

Yes, if the price depends on area, volume or specification: the client sees a ballpark figure straight away and sends an enquiry with the parameters already filled in. If you only quote after a site visit, an enquiry form and a WhatsApp button are enough.

Can I move my site off Tilda without losing Google rankings?

Yes, as long as the page addresses stay the same or every old address gets a 301 redirect. That is how I moved rekrovli.kz, ismerdoors.kz and enstroy.kz, and when qzpanel.kz moved off its old site I set up redirects for 326 addresses.

Who owns the domain and the website?

Your company does: the domain, hosting, code, analytics and Search Console all belong to you. If you ever decide to work with another developer, you lose nothing.

Get a quote
Get a quote